The Bison Bluff Well Project

Drilling was performed Day and Night for about a Month. Sound walls protected the residential neighbors from sound and light at night.

Drilling was performed Day and Night for about a Month. Sound walls protected the residential neighbors from sound and light at night.

Drill rods and reamer entering the borehole.

Drill rods and reamer entering the borehole.

Driller operator at the borehole

Driller operator at the borehole

Louvered steel screen pipe is placed in the well in sections where water bearing strata are found.

Louvered steel screen pipe is placed in the well in sections where water bearing strata are found.

Insertion of well screens into well.

Insertion of well screens into well.

The Drill Bit.

The Drill Bit.

Insertion of water test pump into the well casing.

Insertion of water test pump into the well casing.

Installation of 350 kw back-up power generator at well site.

Installation of 350 kw back-up power generator at well site.

End view of submersile water test turbine pump.

End view of submersile water test turbine pump.

Testing of well water output.

Testing of well water output.

Well house construction near complete, with well pump 300 horsepower motor in the background.

Well house construction near complete, with well pump 300 horsepower motor in the background.